top of page

RECENT WORK COMPLETED

Naturally, a constant work in progress

Some examples of our range of completed works

Following the fall of a tree, roof and internal works to a period home

During a storm a large tree fell onto the house. Much damage happened to part of the roof, with accompanying internal damage. All aspects of the works were overseen by a Conservation Officer and Surveyor from the loss adjusters. 

Following a vehicle running into the front of a house, external and internal impact damage works were undertaken

A car drove into the front elevation of a house. The wall and a window were damaged, with accompanying internal damage. 

Suspended ceiling tiles replacement works

Following water damage after roof leaks, we had to replace hundreds of suspended ceiling tiles that were water marked or otherwise damaged. We were able to do this during school holidays in short order so that the day-to-day running of the school was not affected.

Following a fire in a flat above a shop, where parts of the property were gutted. Showing before and after images

General Images of completed works

Following a flood from the nearby brook, there was extensive damage to the lower half of the ground floor of this old mill.

Hickenbuild Ltd

01543 500090

Rumer Hill Business Estate, Rumer Hill Rd, Cannock WS11 0ET, UK

  • googlePlaces
  • facebook
  • twitter

©2016-2026 by Hickenbuild Ltd. Proudly created with Wix.com

bottom of page